Community
Product
Solutions
Academia
Resources new
Pricing
Company

gate triggering question

Bogdan Florea
Available for work

About

--- Auto-Generated Description ---
This diagram represents a cyclical resource management system involving a source generating resources, pools for storing resources, and a gate that dictates the flow of resources based on probabilistic outcomes. At the heart of the system, a Source node passively generates resources that are initially directed towards a Pool. This pool acts as a temporary holding area for resources before they are sent through a Gate which operates on a random distribution mode, possibly simulating decision points or random events within the system. Following this, resources either cycle back to the initial Pool or move forward to another Pool, indicating a branching path or a decision outcome within the represented system.

Additionally, a State Connection modifies the behavior of the Source node based on a probabilistic condition, suggesting that outcomes within this system can influence the rate or manner in which resources are generated. This dynamic indicates the presence of feedback loops where the state of the system influences its input, potentially simulating scenarios where resource production or availability is affected by the system's existing state or recent decisions. Overall, this diagram exemplifies a system where resource flow is influenced by both structured pathways and probabilistic events, making it suitable for simulating game mechanics, economic models, or any system where resource management and randomness play pivotal roles.

Tags

This diagram doesn’t have any tags yet
Edited more than 1 year ago
0
5

Enjoying what you see?
Show your appreciation by saving it with a click!

Be the first to this diagram

More from Bogdan Florea