"Model a resource flow system...
About this model
"Model a resource flow system in Machinations.io for a sports event with 200 participants. There are 5 primary Nodes (Pools) labeled Station A to E. Each station requires a processing time (Interaction). After each station, the resource must pass through a 'Shuttle Run' node which introduces a fixed delay representing a 200m run. The system must be a closed loop where entities cycle through A - Run - B - Run - C - Run - D - Run - E - Run - Finish. Please visualize potential bottlenecks when all 200 entities are active in the loop."
""Model a resource flow system..." is a public Machinations diagram shared in the Community by 居儒 詹, with 22 components.
It was created in April 2026 and last edited in April 2026.
Open the diagram in the Machinations app and press Play to watch the resources move, adjust its values to test how the system responds, or remix it to make an editable copy in My diagrams.